Checklist for facilities
Emergency lighting – Checklist for facilities
Stairwells, corridors, emergency exits: emergency lighting only gets noticed when it is needed – or when it is tested. The checklist turns the test into a routine, checks the control unit or central battery and records who tested when and what was faulty.
For iPhone & iPad · priced per location, all staff included
EMERGENCY LIGHTING
Monthly function test of safety and emergency lighting.
- 7Check items
- 1Required photos
- MonthlyRhythm
- 7 daysLead time
The first due date is the day you create the checklist; after that it is due every month on the same day. It appears in “Today” 7 days before, so there is time to plan it. If it is not done, it is marked overdue and the admins – plus the people responsible, if you assigned the checklist – get a notification. You can change the first date, rhythm, lead time and responsible people afterwards in the editor under “Repeat” and “Responsible”.
| No. | Check item | Photo | |
|---|---|---|---|
| 01 | Exit sign lights at emergency exits and escape routes are on | ||
| 02 | Emergency lighting function test carried outTest button or the system’s instructions | ||
| 03 | No faulty or flickering lights | ||
| 04 | Lights clean and not covered or blocked | ||
| 05 | Control unit or central battery shows no faultIf present | Photo required | |
| 06 | Escape and rescue plans are posted and up to date | ||
| 07 | Defects reported and inspection log updated |
Template from ImpulsCheck · frigew.ski/impulscheck · Tick off digitally instead of printing: try 14 days for free.